From the 31 January 2025, Safety &Security GB ENS will be required on imports into GB from the EU.
Organise your Stena Line North Sea route S&S GB ENS here
Organise all other route S&S GB ENS with CustomsLink

Stena Line introduces battery power

The battery project is an important part of Stena Line's sustainability strategy. In the future our target with the ‘battery’ is to be able to navigate the vessel 50 nautical miles. Before the summer, battery power in port operation will become a reality.